Do you know of two methods for adding corrosion and scale inhibitors to boilers


Release time:

Aug 14,2024

Before adding the medicine, boil it in hot water at 60-70oC and filter it. The intermittent dosing method can be used, which means adding it once per shift or adding it all at once.

One type is a boiler with a water tank or pool, but without an economizer. The medicine can be directly added to the water tank or pool and fed into the furnace through the water supply system;
Another method is to use a dosing funnel to directly pour the medicine into the furnace.
Before adding the medicine, boil it in hot water at 60-70oC and filter it. The intermittent dosing method can be used, which means adding it once per shift or adding it all at once.
After adding chemicals, attention should be paid to controlling the boiler water indicators, with a pH value between 10-12 and a total alkalinity of 6-26mmol/L.
At the same time, regular discharge should be carried out with a discharge rate generally maintained between 5-10%, at least once per shift, and each time should not exceed 30-60 seconds. If there is no change in water level after discharge, check whether the old scale that has fallen off has blocked the pipeline. If the pipeline is blocked, timely measures should be taken.

Contact Us

E-Mail: liubin@ruiyifeed.com

WhatsApp:+8617861160901

Phone: +86-13315977177

Wechat:17861160901

Address:Room 505, Shengji Wealth Building, Yinxing Avenue, Chengyang Street, Juxian County, Rizhao City, Shandong Province

Devout Chemical

WeChat


Copyright @Shandong Devout Chemical Co., Ltd.       Powered by  www.300.cn  SEO

Business License

Consult An Expert Immediately

*Leave your contact information to get a free product quote

Submit